Timberland Tank Project

This project consists of rehabilitation of the Timberland Tank 2 ringwall which includes demolition of the existing swale and concrete apron, foundation preparation, and placement of a new ringwall to reinforce the existing ringwall. The new ringwall includes encasement of existing valve stems within the new wall. Following installation of the ringwall, a concrete apron and replacement of the concrete swale shall be installed for positive drainage around the tank. Minor site grading, excavation, compaction, and backfill may be required to improve drainage around the tank.

PRE-BID CONFERENCE

  • August 26, 2026 at 1:00 pm
  • 100 Gothic Road, Mt. Crested Butte, CO. 81225

BID SUBMISSION DEADLINE DATE

  • September 3, 2026 at 5:00 pm
  • 100 Gothic Road, Mt. Crested Butte, CO. 81225

DOCUMENTS

If downloading documents and planning to submit a bid, please register by notifying info@mcbwsd.com. All registered bidders will receive notifications for updates posted here, including but not limited to, questions, responses, and addenda.

2026.08.17 Timberland Tank Specification Package.pdf2026.08.13 Timberland Tank FINAL STAMPED Drawings.pdf